Perform steps 1 to 5 of How-To: Validate a
protocol source, then:
- you may want to change the step granularity by
using the related control
- press the next step button,
the process will stop in the appropriate point, according to the selected
step granularity:
- the current instruction is highlighted
- the current rule element is selected
- the content of the containers and the substitution map is shown
- press the back
step button if you wish to go back to the previous instruction
- if you wish to terminate the debug session:
Repeat steps 1 to 4 for each validation step.